Miami-Dade County Public Schools (M-DCPS) hosted a groundbreaking ceremony on Tuesday at Miami Arts Studio 6-12 @ Zelda Glazer to celebrate an $8 million remodeling and renovation project that will include the addition of a new building, P.E. Shelter, and covered walkways.
“All of these different groups of students in this school represent the arts that are so important in the lives of our students and community,” said Superintendent of Schools Dr. Jose L. Dotres. “And today, this groundbreaking, with a dance studio and an art studio, addresses everything that pertains to the arts. We owe it to the students, to the parents, to the community, because so many wonderful things come out from this school, the talent, the music.”
In addition to Dr. Dotres, M-DCPS Chief Facilities and Design Construction Officer Raul F. Perez, School Board member Monica Colucci, Miami Arts Studio @ Zelda Glazer Principal Dr. Balsera, school staff, and students gathered at the school for the event.
Veitia Padron, Inc. was awarded the project, which includes a new 14,000 sq. ft. building, with classrooms for dance, band, and music, including several auxiliary rooms for storage and practice.
“I think it’s a privilege being able to play with students who have incredible talents and being surrounded by such expensive equipment that we’re so privileged to have,” said 11th Grader Cesar Perez, who is in the band magnet. “It’s a blessing to be able to do what we do every day, and this new building will help us to improve our performances even more.”
Miami Arts Studio 6-12@Zelda
Glazer students from the chorus magnet performing at the groundbreaking
ceremony
These school bond projects resulted from voter approval of the $1.2 billion General Obligation Bond in 2012. Funds from the bond are being used to modernize and construct school buildings throughout the District, expand student capacity, enhance facility safety, and provide technology upgrades at all schools.
For the most up-to-date information, please download the Dadeschools Mobile App to your iPhone or Android device. Follow us on X @MDCPS and @SuptDotres, on Instagram @miamischools and @suptdotres, and on Facebook at MiamiSchools.
TOP CAPTION: Pictured center: M-DCPS Administrative Director of Design and Sustainability
Erick Laventure, Assistant Superintendent, Facilities and Operations Marilyn Capon,
Chief Facilities Design and Construction Officer Raul Perez, South Region
Superintendent Rafael Villalobos, Schools Superintendent Dr. Jose L. Dotres,
and School Board Vice Chair Monica Colucci, students, staff and District Representatives all gathered for the groundbreaking.
# # #
25-VSP/137/AR